학술발표회 논문집
Year | Div | Date/Time | ROOM | Title | Author | Abstract File | Presentation File |
---|---|---|---|---|---|---|---|
2019-Spring | 10B : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.23(Thu) 10:20 | 401B (4F) | Some Insights on Scale Rack Motion during the Seismic Excitation in Simulated Spent Fuel Pool Accident | Kang-Hee Lee, Heung-Seok Kang, Dong-Seok Oh, Kyung-Ho Yoon, and Soo-Ho Kim(KAERI), Cheong-Ryul Choi(Elsoltec) | PDF보기 | - |
2019-Spring | 10B : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.23(Thu) 11:00 | 401B (4F) | Analysis of Horizontal Hysteretic Behavior of LRB in Two-Dimensional Large Deformation Behavior | Minkyu Kim(KAERI) | PDF보기 | - |
2019-Spring | 10B : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.23(Thu) 11:20 | 401B (4F) | Experiment of Dynamic Pressure Distribution on Spent Fuel Pool Model due to Sloshing | Dong Seok Oh, Soo Ho Kim, Kang Hee Lee, Kyung Ho Yoon, and Heung Seok Kang(KAERI) | PDF보기 | - |
2019-Spring | 10B : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.23(Thu) 11:40 | 401B (4F) | Safety Review and Action for Earthquake in Nuclear Power Plants | Chang Seok Park(KHNP), Jin Weon Kim(CSU) | PDF보기 | - |
2019-Spring | 10B : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.23(Thu) 12:00 | 401B (4F) | Decrement Damping Ratio of Light Equipment due to Structure-equipment Interaction | Hyeon-Keun Yang, Hong-Gun Park, and Ju-Hyung Kim(SNU) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 09:00 | 401B (4F) | Vibration Control of Piping System in Nuclear Power Plant Using Elasto-plastic Steel Coil Spring Damper under Earthquake | Sung Gook Cho(Innose Tech), Osamu Furuya(TDU), Hiroshi Kurabayashi(Vibro system) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 09:20 | 401B (4F) | Determination of Proportional Damping Matrix in Dynamic Analysis using Direct Integral Method under Simultaneous Excitation in Three Direction | Choon-Gyo Seo, Young-Suk Lee, Kag-Su Jang, and Young-Sik Jang(KEPCO E&C) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 09:40 | 401B (4F) | Shear Capacity Evaluation of RC Shear Wall by Bi-directional Horizontal Loading Test | Junhee PARK and Kunsoo KIM(KAERI) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 10:00 | 401B (4F) | Development of Sampling-based Risk Quantification Code for Seismic Probabilistic Safety Assessment | Shinyoung Kwag, Junhee Park, and In-Kil Choi(KAERI) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 10:20 | 401B (4F) | Experimental Investigation of Soil-Structure Interaction Effect on Seismic Structural Response using Centrifuge Test | Jeong-Gon Ha(KAERI), Kil-Wan Ko and Dong-Soo Kim(KAIST) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 11:00 | 401B (4F) | Ground Motion Response Spectra Considering Soil Amplification | Jin Ho Lee(PKNU), Jung Han Kim(PNU) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 11:20 | 401B (4F) | Investigation of Pressure Distribution by Sloshing Effect for the Seismic Safety Assessment of the Spent Fuel Pool | Won Man Park, Sungman Son, Dae Kyung Choi, and Choengryul Choi(Elsoltec), Kang Hee Lee and Heung Seok Kang(KAERI) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 11:40 | 401B (4F) | Validation of an Equivalent Test Condition for a Scaled-down Model of the Spent Fuel Pool for Seismic Safety Assessment | Sungman Son, Won Man Park, Dae Kyung Choi, and Choengryul Choi(Elsoltec), Kang Hee Lee and Heung Seok Kang(KAERI) | PDF보기 | - |
2019-Spring | 10C : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 12:00 | 401B (4F) | Generation of a Pilot GMRS through Probabilistic Site Response Analysis | Seung Ryong Han, Young Suk Lee, and Jae Hee Kim(KEPCO E&C) | PDF보기 | - |
2019-Spring | 10D : 원전 건설 및 운영 기술 (Nuclear Power Plant Construction and Operation Technology) | 5.24(Fri) 13:30 | 401B (4F) | Evaluation of the Increase in the POSRV Closing Time for APR1400 | Tech Mo Kim, Ju Han Lee, In Ho Song, and Gyu Cheon Lee(KEPCO E&C) | PDF보기 | - |
Last Modified : 1998-Autumn