학술발표회 논문집
Year | Div | Date/Time | ROOM | Title | Author | Abstract File | Presentation File |
---|---|---|---|---|---|---|---|
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Corrosion Mechanism of Alloy 600 in Aqueous Na2S2O3 Solutions at 340℃ | E. H. Lee, K. M. Kim, B. S. Choi, and W. Y. Maeng(KAERI) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Characteristics of Nano-sized TiO2 for an Inhibitor of SCC | Kyung Mo Kim, Eun Hee Lee, Uh Chul Kim, Byung Seon Choi, and Wan Young Maeng(KAERI) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | The Effect of the pH and Dissolved O2 on a γ-radiolysis of Water | Byung-Seon Choi and Wan-Young Maeng(KAERI) J. Clara Wren(Univ., of Western Ontario) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Development of Experimental Method to Simulate the Corrosion Products in the Primary System of Nuclear Power Plant | Sanghyun Kim and Wan Young Maeng(KAERI) Mun Hwan Kim and Chang Whan Won(CNU) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Identification and Assessment of Recent Agingrelated Degradation Occurrences in U.S. NPP | Min Kyu Kim, In Kil Choi, and Young-Sun Choun(KAERI) Jinsuo Nie, Joseph I. Braverman, Charles H. Hof | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Aging Evaluation for NPP Cable with XLPE Insulation by Using Oxidation Induction Time Measurement Test | Kyung-Nam Jang(KEPRI) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Harmonization of IEEE323 and IEC60780 Standards for Environmental Qualification of Electric Equipments | Jong-Seog Kim(KEPRI) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Determination of the Minimum Acceptable Value of Insulation Resistance for Formwound Motor Winding EQ Test | Kyung-Heum Park(KEPRI) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Tube Plugging Criterion for the TPCCW Heat Exchanger of Yonggwang NPP 1&2 | Hyung-nam Kim, Hyun-ju Yoo, Sung-nam Choi, and Seok-yoon Song(KEPRI) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Statistic Analysis of Operating Experience Using DIOS | Il S. Lee, Min C. Kim, Ji T. Kim, and Durk H. Lee(KINS) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Preliminary Study about PTFE/ESR Dosimetry | Park Byeong Ryong, An Jin Hee, and Choi Hoon(RHRI) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Simulation of Local Damage to Reinforced Concrete Structures Caused by Impact of Aircraft Engine Missiles | Sang Hoon Noh, Jong Bo Lee, and Chong Hak Kim(KHNP) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Establishment of the In-service Test Management System for Nuclear Power Plants Using Database System | Young Wook Chung, Soon Joon Hong, and Soon Il Chung(FNC) Tae-Gun Ha and Gang-Il Choo(KHNP) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Analysis of a Near-field Earthquake Record at the Deep Underground Research Tunnel | Kwan-Hee Yum and Dong-Hee Park(KEPRI), Taek-Mo Shim(KINS) | PDF보기 | - | ||
2009-Spring | 제 8 분과 원자력발전소 건설 및 운영(Nuclear Power Plant Construction and Operation) | Necessity of Monitoring the Sea Level and Temperature Near the NPP Site | Seung Gyu Hyun, Hoseon Choi, and Sobeom Jin(KINS) | PDF보기 | - |
Last Modified : 1998-Autumn