-->

학술발표회 논문집

Year Div Date/Time ROOM Title Author Abstract File Presentation File
2016-Spring 8A : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 10:20 303B (3F) Design Features of a Spent Fuel Transfer Device between Spent Fuel Storage Pools in NPPs Il Seon Hwang, Kwang Jeok Ko, Min Gyu Kim, Yeon Ho Cho, and Hyun Min Kim(KEPCO E&C) PDF보기 -
2016-Spring 8A : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 11:00 303B (3F) Seismic Capacity Estimation of Steel Piping Elbow under Low-cycle Fatigue Loading Bub Gyu Jeon, Sung Wan Kim, Hyoung Suk Choi, and Nam Sik Kim(PNU), Dae Gi Hahm(KAERI) PDF보기 PPT보기
2016-Spring 8A : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 11:20 303B (3F) A Study of System Pressure Transients Generated by Isolation Valve Open/Closure in Orifice Manifold Min Kim(KEPCO E&C), Sangwook Bae, Jeongin Kim, and Seonjoung Kim(KHNP) PDF보기 -
2016-Spring 8A : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 11:40 303B (3F) Heat Transfer Properties for RMI(Reflective Metal Insulation) Thin Plate Designs Sungmyung Lee, Kyewhan Jang, and wonseok Kim(BHI Co., Ltd) PDF보기 -
2016-Spring 8A : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 12:00 303B (3F) Sensitivity Analysis on Elbow Piping Components in Seismically Isolated NPP under Seismic Loading Heekun Ju, Daegi Hahm, and Min Kyu Kim(KAERI), Bub Gyu Jeon and Nam Sik Kim(PNU) PDF보기 -
2016-Spring 8B : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 09:30 400 (4F) (초청발표1) Improvement of Integrated NSSS Integrity Monitoring System Jin-Ho Park and Doo-Byung Yoon(KAERI) PDF보기 -
2016-Spring 8B : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 10:00 400 (4F) Applicability of Alignment and Combination Rules to Burst Pressure Prediction of Multiple-flawed Steam Generator Tube Myeong-Woo Lee, Ji-Seok Kim, and Yun-Jae Kim(KU), Jun-Young Jeon(DOOSAN), Dong-Min Lee(KEPCO KPS) PDF보기 PPT보기
2016-Spring 8B : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 10:20 400 (4F) Autonomous Monitoring Aerial Robot System for Nuclear Power Plants Ji H. Kim, Beom W. Gu, Van X. Thai, and Chun T. Rim(KAIST) PDF보기 -
2016-Spring 8B : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 11:00 400 (4F) New Approach to Enhance an Effect of Condition Monitoring of Mid/Small Size Rotating Equipment in Nuclear Power Plant You-Soo Shin and Hee-Seung Chang(KHNP) PDF보기 -
2016-Spring 8B : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 11:20 400 (4F) Development of Preemptive Repair Technology for Alloy 600 J-Groove Welds of Reactor Vessel Upper Head CEDM Nozzles Kwang Woon Jung, Jang Wook Lee, Ki Hyun Cho, Kwang Min Choi, Dong Chul Choi, Sang Beum Cho, and Hong Seok Cho(KEPCO KPS) PDF보기 -
2016-Spring 8B : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 11:40 400 (4F) Development Methodology of a P-Number Equivalent Table of Unassigned Materials for Nuclear Power Plants Hong Seok Cho, Jang Wook Lee, and Kwang Woon Jung(KEPCO KPS), Sang Woo Song and Sang Hoon Lee(KIMS), Myoung Sung Sohn(KEA) PDF보기 -
2016-Spring 8B : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.12(Thu) 12:00 400 (4F) Application of Ultrasonic NDT Technique for Butt Fusion Joints of Plastic Pipes Taegyung Kim, Hyungtaik Lim, Jeongguen Choi, and Jaemyung Lee(ANSCO) PDF보기 -
2016-Spring 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.13(Fri) 09:30 400 (4F) (초청발표1) A Study for Evms Application to Npp Construction Project MyungSub Roh and JeongKeun Kwak(KINGS) PDF보기 -
2016-Spring 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.13(Fri) 10:00 400 (4F) Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects Young Joo Kim(KNS) PDF보기 -
2016-Spring 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) 5.13(Fri) 10:20 400 (4F) Flaw Detection using Electromagnetic Acoustic Resonance for a Tube of NPP Dong Min Lee, Yong Kwon Kim, and Sang Hoon Choi(KEPCO KPS) PDF보기 -
Last Modified : 1998-Autumn